Tuesday 7 May 2013

Bathrooms and Kitchen


My SS was very kind and met me on site today as I am having some time off work.

It was so exciting to see the Bathrooms and Kitchen!!!!

So now:-

 - All wet area tiles have been done.
 - Cupboards are installed.
 - Our Benchtops are installed.
 - The painters look like they have painted the ceiling, doors and doorframes and undercoated the walls.
 - The plasterer has patched and sanded and the walls are ready for their final coats which should be  
   done in the next 2 days.
 - Our watertank is also in.

The Electrician and Plumber will be back later this week and early next week so that things like the shower frames etc will be installed.

It's all so exciting - I took lots of photos so be ready to be bombarded:-


Master Bedroom Windows

Ensuite

Ensuite

This will be our Ensuite, Walk in Robe and Pantry doors

Home Theatre

Home Theatre

Hallway Looking out to the Front

Hallway

Front Door (half stained) and Hallway

Main Living Area


Kitchen (with benchtops covered)

Kitchen (with benchtops covered)

Alfresco (with pool in background)

Children's Activity Room

Children's Activity Room (The desk is covered but is the same as the bottom kitchen cupboards)

Laundry

This will most likely be my Study / Fourth Bedroom

Bathroom

Bathroom

Bathroom

Toilet

Second Bedroom

Third Bedroom

Water Tank 

Alfresco

I don't think I will get a chance to go back between now and PCI so I think these will be the last photos for a while but I will try to keep updating my timetable based on the updates from my SS.